Product Detail :
|
Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Fluoride Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/ etc.) certified by CSIR or any other institute of national repute. In the District of , Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected). Under P.H.Division, Jamui(Detials as per abstract of work)
|