Product Detail :
|
Design and build four sewage treatment plant of installed capacity 4.6 mld, mld, 5.8 mld and 6.3 mld alongwith all appurtenant structures and allied works controlled with scada including with out fall drains of length 97 mtr, 392 mtr, 75 mtr and 72 mtr respectively 1 survey, review the designs, redesign where necessary, and build three pumping stations including 5713 mtr interception drain , including screens and mechanically operated gates facilitating including construction/repair of missing/broken existing peripheral drains of motijheel including 1 operation & maintenance of the complete works of sewage treatment plant, interception & diversion works, and effluent channel for a period of 15 years in motihari town , state of bihar, india
|