Product Detail :
|
Empanelled firms / consultants of wrd preparation of dpr for formulating suitable arrangement like construction of new pynes, renovation of old pynes, resectioning of existing embankment, construction of afs and other hydraulic structure etc for passing the high flash flood discharge of river falgu from the d/ s of uderasthan to fathua mokama tal area safely after conducting detailed survey and investigation.
|