Product Detail :
|
Construction of pre-fab structure second floor guiding above first floor of existing collectorate building at dm office including civil, electrical, water supply, sanitary, fire fighting, furniture and furnishing etc all complete job as per direction of e/i on turnkey basis (scope of work and detailed specification and construction site as per attached sheet on website).
|