|
Product Detail :
|
Silt Cleaning and Embankment Repair at Various Points of Asni Distributary and Repair and Protective Works of Hr, Fall, Fall Cum Bridge and Bridge, Culvert at Various Points, Silt Cleaning and Embankment Repair and Renovation of One Outlet at Various Points of Dhanupra Distributary, Silt Cleaning and Dam Repair Work at Various Points From 68.73 Km to 84.05 Km of Ara Main Canal, Repair Work, Outlet Construction and Earthwork on Hr of Rpc-b, Protective Work and Outlet Construction Work in Diliyanarayanpur Distributary, Dam Repair and Silt Cleaning Work at Various Points of Ara Main Canal, Dam Repair and Silt Cleaning Work at Various Points of Kumhari Canal, Dam Repair and Silt Cleaning and Outlet Construction Work at Various Points of Panwari Distributary, Geo Bag at Various Points Between 21.724 Km to 30.554 Km of Ara Main Canal Pitching, Dam Repair and Construction of Protective Wall, Outlet Construction and Silt Cleaning Work at Various Points Between 0.00 Km to 15.00 Km of Sakala Distributary, Dam Repair and Construction of Protective Wall with G.e.o Bag at Various Points of Kataiya Distributary, Dam Repair and Construction of Protective Wall with G.e.o Bag of Gadhani Sub-distributary, Dam Repair and Construction of Protective Wall with G.e.o Bag at Khelaria Fall of Bihiya Branch Canal, Protective Wall Cc Block and Siphon Construction of 1200 Mm Diameter at 4.7 Km of Keshari Distributary and Silt Cleaning Work, Construction of Damaged Outlet at Various Points, Construction of 10 More Outlets at Various Points of Taar Distributary, Construction of 4 More Damaged Face Walls and Pcc Work in the Bed of 2 More Siphons, Dam Repair and Silt Cleaning Work at Various Points of Lpc-b Cleaning Work, Dam Repair and Silt Cleaning and Protective Wall Construction Work Between 0-00 Km to 4.50 Km of Amuna Distribution, Repair Work Near 0-00 Km Hr of Kori Sub-distribution. Dam Repair and Silt Cleaning Work at Various Points of Lpc-d, Dam Repair and Silt Cleaning Work at Various Points of Chaurai Sub-distribution, Dam Repair and Silt Cleaning Work at Various Points of Bichhiyaon Sub-distribution. Renovation Work of One Additional Outlet in Belaur Sub-distribution. Construction Work of Outlet at Various Points of Hetampur Distribution. Construction Work of 3 Additional Outlets and Construction of 2 Additional Face Walls at Various Points of R.p.c-3 and Construction Work of 2 Additional Outlets at Various Points of R.p.c-4.
|