Product Detail :
|
Construction & Resetting of new Pontoon Bridge (Fabrication- 65 Sets and 45 old sets Total 110 sets) of pontoon and maintenance of Pontoon Bridge from 2022-23 to 2027-28 and dismantling of Pontoon Bridge from the Alignment and storing the Pontoon set at safe place on the side of River embankment at Ghaghra (Sarayug) between Sitab Diara Ghat to Rivilganj Mandir Ghat in saran district during rainy season and watching the Pontoon sets safety anchored along the River embankment during rainy season for six month as well as re-arranging the Pontoon sets whenever required due to increasing and decreasing of water level.
|